Logo

Project

Accurate Meter & Supply

Dally + Associates collaborated with Collaborate Architects on to design and prepare this new 5.4-acre site for Accurate Meter & Supply’s new company headquarters in Katy. The site includes a 10,000 sf warehouse, detention pond, parking lot, and underground utilities.

SNAPP Industrial Park

Dally + Associates collaborated with American Commercial Contractors on this new 10.37 – acre industrial site for SNAPP. The 111,000 sf warehouse located on site will be joined by a detention pond, parking lot, and we planned the layout for all underground utilities.

Milby High School, Houston ISD

Dally + Associates collaborated with PBK Architects and DivisionOne Construction on the new 18.87 – acre site for Milby High School in HISD. The new school building is a 7,523 sf which our team planned along with all the sidewalks on the campus and all underground utilities that will service the site.

Child Advocates of Fort Bend

Dally + Associates collaborated with Gensler Architecture on this new 1.15 – acre site for the Child Advocate of Fort Bend. The site includes a new 8,519 sf building, sidewalks, a parking lot, and underground utilities.

City of Houston Material Recycling Facility

Dally + Associates collaborated with FCC Environmental and Horizon International Group Construction on the new, state of the art, 10.77 – acre site and 117,455 sf building for the City of Houston. The team was also responsible for planning the detention pond, parking lot, and all underground utilities for the new facility.

reCenter Houston

Dally + Associates worked with Brave Architects on the new 5-story, 50,000 sf facility for a Harris county non-profit addiction recovery organization. Our team provided Civil Engineering services including site layout, grading, utilities and drainage.

Baldwin Boettcher Branch Library

Dally + Associates collaborated with Architects to provide Civil Engineering services for the Harris County public library system to renovate the Baldwin Boettcher Branch Library after damage from Hurricane Harvey. The new site and building will be designed for water mitigation and drainage for possible future high water events.

Harris County Flood Control District Projects

Dally + Associates has worked with DMC Construction on multiple projects throughout the county for the Harris County Flood Control District. Our team has assisted the county in surveying and repairing channels, changing flood control piping, and designing modifications to the bayous throughout the county.

Scroll to Top