Logo

Higher Education

Texas A&M University – Rollins Urban & Structural Entomology Facility

Dally + Associates collaborated with EYP Architecture (formerly WHR Architects) and Madison Construction to complete the design for this 1-story, 10,000 sf laboratory and research center that is part of the Department of Entomology at Texas A&M University in College Station, TX. The state-of-the art facility, which includes laboratories, a conference room, offices, and training areas, provides world-class …

Texas A&M University – Rollins Urban & Structural Entomology Facility Read More »

Texas A&M – Office of the State Chemist

Dally + Associates collaborated with EYP Architecture (previously WHR Architects) to design two biosafety level three (BSL3) laboratories, locker rooms, toilets and anterooms that support the current BSL3 lab at the Office of the State Chemist Building on the Texas A&M University campus in College Station, TX.

Lone Star College University Park – Center for Science & Innovation

Dally + Associates collaborated with Kirksey Architecture to design this new 3-story, 50,000 sf building that supports science, technology and engineering education, and includes 12-laboratories, classrooms, an outdoor observation deck and collaborative design work areas. On each story, four labs are connected by a continuous preparatory area thoughtfully laid out with storage, work tables, and space …

Lone Star College University Park – Center for Science & Innovation Read More »

Texas State University – Alkek Repository

Dally + Associates collaborated with Harrison Kornberg Architects to provide structural engineering services for the construction of a brand new 1-story, 19,000 sf repository (library) capable of holding one million volumes.

Texas Southern University – Samuel Milton Nabrit Science Center Renovation

Dally + Associates collaborated with PBK to provide structural engineering services for the demolition of the major (central) portion of an existing building while leaving the underground mechanical tunnel in place, as well as modifications to existing MEP infrastructure and renovations to remaining portions of the existing facility.

Scroll to Top