Logo

Page/

Houston Police Department McNair Police Station

Dally + Associates collaborated with Page/ to complete the design for this 20,000 sf police station in south central Houston. The structural system for this building consists of steel framing and steel bar joists.

Houston Police Department Property Relocation

Dally + Associates collaborated with Page/ to complete the design and planning of a Houston Police Department property relocation. This particular station consists of a 150,000 sf office and storage area, a 30,000 sf outdoor storage area, two fuel bays and car wash.

Tomball Regional Hospital Cancer Center

Dally + Associates collaborated with Page/ to complete the design for this 2-story, 50,000 sf medical office building in Tomball, TX. The building was designed to be used as a multidisciplinary therapy clinic for cancer patients.  The office building houses labs for radiation therapy, cancer treatment and offices/areas for follow-up services.

Millennium Plaza

Dally + Associates collaborated with Page/ to complete the design for this 14-story, 348,000 sf office building in Dakar, Senegal. Below the building sits one level of below-grade parking for both employees and visitors.

M.D. Anderson Cancer Center

Dally + Associates collaborated with Page/ and Walter P. Moore to complete the design for this 21-story, 900,000 sf faculty center in Houston, TX. The building was designed to serve a multitude of purposes, such as patient care, research and education for undergraduate and graduate students, trainees, employees, professional and the public.

ExxonMobil

Dally + Associates collaborated with Page/ to complete the design for this 6-story, 180,000 sf corporate office building in Malabo, Equatorial Guinea. The building was designed to be used as ExxonMobil’s headquarters in Equatorial Guinea, and consists of composite structural framing.

Cambridge Properties Parking Garage

Dally + Associates collaborated with Page/ and Harvey Builders to complete the design for this 10-story, 221,000 sf medical office building in Houston, TX. Adjacent to the building stands a 14-level, 1,400 car parking garage designated for building occupants and visitors.

Kempinski Hotel Gold Coast City Accra

Dally + Associates collaborated with Page/ to complete the design of this 7-story, 269 room hotel. The hotel also includes 22 luxury suites and 2 presidential suites, expansive meeting and event spaces, an in-house art gallery, spa and fitness facilities, as well as a shopping mall and carpark that sits adjacent to the main building.

ExxonMobil

Dally + Associates collaborated with Page/ to design this 3-story, 98,000 sf training center for ExxonMobil in Beaumont, TX. The center consists of a training area, offices, conference rooms and cafeteria, and the entire structure was designed for blast resistance.

Avenue CDC

Dally + Associates is currently collaborating with Page/ to design a new Office and Home Ownership Center for Avenue CDC, a nonprofit organization dedicated to developing quality affordable homes, educating first time homebuyers, and strengthening communities. The 3-story office building will be a steel-frame structure with brick veneer, metal siding and concrete paving.

Scroll to Top