Huitt Zollars

Houston ISD | Madison High School

Dally + Associates collaborated with Huitt Zollars, Inc. to complete the design for this multi-story high school. The campus currently consists of 5 buildings and 21 temporary buildings which were replaced by one new, 267,000 sf multi-story building capable of holding 1,900 to 2,100 students. The building also incorporates recent science and classroom building renovations.

Houston ISD | Madison High School Read More »

Aldine ISD | Townsen Blvd. Middle School

Dally + Associates, Huitt-Zollars, Inc. and PepperLawson Construction are currently collaborating to complete the design for this new 202,651 sf intermediate school located in Aldine ISD. The building features classrooms, science and computer labs, a library, cafeteria and prep space, and administrative offices. The building also houses a gymnasium that includes a competition court, practice,

Aldine ISD | Townsen Blvd. Middle School Read More »

Houston Community College – Flood Simulation – Resiliency Operations Center

Dally + Associates is collaborating with Huitt Zollars on this brand new 65,000 sf, 70-acre site, that includes 2.5-acre flatwater pond, variable configuration swift water channel, as well as an urban flood simulator with mock-up buildings and a low head dam simulation. The design also features re-configurable obstacles and movable equipment to sculpt the swift

Houston Community College – Flood Simulation – Resiliency Operations Center Read More »

Scroll to Top