Dally + Associates is collaborating with DLR on the new Fort Bend ISD #12 High School. The project will be a brand new, 2-story, 485,000 sf, LEED certified school to alleviate overcrowding at Ridge Point High School. When complete, the new school will offer space for 2,800 students. However, core elements of the campus such as the cafeteria and common areas are designed to accommodate up to 3,000 students to allow possible future expansion of the campus.